Never assume everybody is on the same page. It features over 10 different items to check both before and after. The Preparatory Demolition Checklist follows best practices for safety and regulatory compliance with OSHA Standard Number 1926.850 for preparatory demolition. Have a meeting every morning to review the daily activities and communicated with all employees and subcontractors. This quality control checklist is for demolition work, specifically structural removals. Good planning will help reduce potential problems. Make sure oily rags do not present a fire hazardĭo not overload floors with material, they could collapse.ĭo not demolish walls and floors adjacent to other workers.ĭelineate area as caution and/or dangerous Let’s take a look at what’s included in the checklist. It’s available in two formats, the downloadable PDF or the customizable version found in our inspection and incident reporting app, 1st Reporting. When cutting steel, secure gas bottles, use flashback arresters and practice good fire prevention, or utilize hot work procedures. Stay compliant, and more importantly, keep your team safe with safety tools like our Demolition Checklist for preparatory operations. Verify that services have been locked out (Lock out, verify)Įnsure air quality if using gas fired equipment Will not adversely affect the safety of the public or occupiers. Is not larger than 40 square metres in floor area. This article explains the importance von a demolition safety control and identifier. Never enter a building if it appears to be unsafe Demolition Is not constructed of masonry. This article explains who importance of a demolition safety control and identifies what types of questions shouldn be contained. Inspection records shall be available for review by the. The survey report must be located at the job site for the duration of the demolition operations. Fire extinguishing equipment shall be available subject to the authority having jurisdiction. You must have, in writing, evidence that this survey has been performed. checklist reference no: revision: 0 page:1 of 8 associated procedure: kga-073 construction site health and safety inspection checklist (this document must be completed by the principal contractor and signed by client contract project manager and eskom safety risk manager before start of works. NOTE: An Engineering Survey completed by a competent person is required and must be followed prior to the start of demolition operations. Communication is the best line of defense to reduce injury. Falls and premature collapse of structures are the greatest risk. Demolition is high-risk work and adequate preparations are required.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |